Task


Airtec Services (Yorkshire) Limited was asked to tender for the above project to install air conditioning to the new board room.

Solution


The work was carried out in normal office hours in order to keep the project cost down. A cooling only cassette system was thought to be the best option for this project, which would give the client a comfortable environment to work in. The indoor cassette unit was installed central to the area to be conditioned to allow an even distribution of air. The outdoor condensing unit was then sited to the rear of the building at high level on cantilever brackets.

Equipment


Daikin